EPM

Asset Condition Assessments

Equipment in Hazardous Areas

Special precautions need to be taken in hazardous areas to prevent equipment from being a source of ignition. In situations where an explosive atmosphere has a high likelihood of occurring, reliance is placed on using equipment with a low probability of creating a source of ignition.

In the main, an Asset Condition Assessment and Compliance Study will identify all assets that are located in Hazardous Zones, noting them as being acceptable or as representing a potential explosive risk. 

Electrical Equipment Risk

The selection of electrical equipment for safe use in hazardous areas has been the subject of strict control for many years. BS EN 60079 Part 17 covers Inspections and Maintenance of Electrical Installations in Hazardous Areas.

Every single potential ignition source must be accounted for, and inspection protocols put in place to demonstrate due diligence. BS EN 60079 Part 17 refers to three inspections grades Visual, Close and Detailed. These should be in place as standard as part of your ongoing maintenance plan.

Electrical equipment will also be assessed by virtue of its manufacturer’s nameplate, glanding and classification details as to its suitability for operation in its hazardous zone.

We’ll check all that for you.

Non- Electrical Equipment (Mechanical and Rotating) Risk

Operation or failure modes of Non- Electrical equipment could represent a potential explosive risk too.
A risk assessment of all equipment in hazardous zones will be required to complete an audit trail.

Generally there are two mechanical ignition scenarios that need to be considered. these are, ignition resulting from a failure in the machine such as a bearing over-heating or ignition created by the normal functioning of the machine such as a hot brake surface (ref: BS EN ISO 80079-36:2016)

The study outcome will be an asset condition and defect report for Electrical and Non-Electrical equipment located in identified Hazardous Area Zones.

The following are considerations for the closure stage of this work:

  • Suggested solutions for remedial action or otherwise,
  • Arrange for remedial work to be carried out as required,
  • Arrange for tags, drawings and CMMS to be amended/ updated as required,
  • Documented audit trail in place, 

EPM specialise in Asset Integrity and Compliance, it’s what we do

Your problem, our response

Asset intensive, industrial, hazardous & FM environments?

Discover how we 
can help your business

Complete our 2 minute survey 
to see how.
Take the survey